鐘愉翔
職  稱
助理教授
學  歷
國立交通大學工業工程與管理學系博士班
電  話
(04)23924505#6019
研 究 室
M612
網  頁
專  長
Smart Manufacturing
Production Management
Operation Research
Applied Statistics
Quality Management
Scheduling and Dispatching
Database Application
簡要經歷
2013~2015 /Unimicron /Department of Production Management /Deputy Manager(代)
2015~2017 /Xintec /Department of Production Management /Project Leader Engineer
2017~2019 /Micron (Taichung) /Department of Precise Production Planning /Senier Engineer
2019~2024 /Micron (Taichung) /Department of Industrial Engineering Automation Operation Intelligence /Senier Engineer
2024~Now /NCUT /Department of Industrial Engineering and Management /Assistant Profess0R
學術專長
Scheduling, Meta-Heuristic
著作發表
具有學習效果的流程式生產排程之最大完工時間與總完工時間最小化之研究. 國立交通大學, 2011.
期刊論文
1
Chin-Chia Wu, Juin-Han Chen*, Win-Chin Lin, Xingong Zhang, Tao Ren, Zong-Lin Wu and Yu-Hsiang Chung. A robust single-machine scheduling problem with scenario-dependent processing times and release dates. International Journal of Industrial Engineering Computations, 2025, 16, 37-50. (SCI)
2 Jian-You Xu, Win-Chin Lin, Yu-Wei Chang, Yu-Hsiang Chung, Juin-Han Chen, Chin-Chia Wu*. A Two-Machine Learning Date Flow-Shop Scheduling Problem with Heuristics and Population-Based GA to Minimize the Makespan. Mathematics, 2023, 11, 4060 (SCI)
3 Wen-Chiung Lee, Yu-Hsiang Chung, Jen-Ya Wang. A parallel-machine scheduling problem with two competing agents. Engineering Optimization, 2017, 49, 962-975. (SCI)
4 Wen-Chiung Lee, Yau-Ren Shiau, Yu-Hsiang Chung, Lawson Ding. Single-machine scheduling to minimize total completion time and tardiness with two competing agents. The Scientific W0Rld Journal, 2014. Article ID 596306, 9 pages.
5 Wen-Chiung Lee, Wei-Chang Yeh, Yu-Hsiang Chung*. Total tardiness minimization in permutation flowshop with deteri0Ration consideration. Applied Mathematical Modelling, 2014, 38, 3081-3092. (SCI)
6 Wen-Chiung Lee, Yu-Hsiang Chung, Zong-Ren Huang. A single-machine bi-criterion scheduling problem with two agents. Applied Mathematics and Computation, 2013, 219, 10831-10841. (SCI)
7 T.C.E.Cheng, Yu-Hsiang Chung, Shan-Ci Liao, Wen-Chiung Lee. Two-agent singe-machine scheduling with release times to minimize the total weighted completion time. Computers & Operations Research, 2013, 40, 353-361. (SCI)
8 Wen-Chiung Lee, Yu-Hsiang Chung*. Permutation flowshop scheduling to minimize the total tardiness with learning effects. International Journal of Production Economics, 2013, 141, 327-334. (SCI)
9 Yu-Hsiang Chung*. Lee-Ing Tong. Bi-criteria minimization f0R the permutation flowshop scheduling problem with machine-based learning effects. Computers & Industrial Engineering, 2012, 63, 302-312. (SCI)
10 Wen-Chiung Lee, Yu-Hsiang Chung, Mei-Chia Hu. Genetic alg0Rithms f0R a two-agent single-machine problem with release time. Applied Soft Computing, 2012, 12, 3580-3589. (SCI)
11 Yu-Hsiang Chung*. Lee-Ing Tong. Makespan minimization f0R m-machine permutation flowshop scheduling problem with learning considerations. International Journal of Advanced Manufacturing Technology, 2011, 56, 355-367. (SCI)
12 Wen-Chiung Lee, Chin-Chia Wu, Yu-Hsiang Chung, Han-Chu Liu. Minimizing the total completion time in permutation flow shop with machine-dependent job deteri0Ration rates. Computers & Operations Research, 2009, 36, 2111-2121. (SCI)
13 Yu-Hsiang Chung, Han-Chu Liu, Chin-Chia Wu, Wen-Chiung Lee*. A deteri0Rating jobs problem with quadratic function of job lateness. Computers & Industrial Engineering, 2009, 57, 1182-1186. (SCI)
14 Wen-Chiung Lee, Chin-Chia Wu, Chien-Chih Wen, Yu-Hsiang Chung. A two-machine flowshop makespan scheduling problems with deteri0Rating jobs. Computers & Industrial Engineering, 2008, 54, 737-749. (SCI)
15 Wen-Chiung Lee, Chin-Chia Wu, Yu-Hsiang Chung. Scheduling deteri0Rating jobs on a single machine with release times. Computers & Industrial Engineering, 2008, 54, 441-452. (SCI)
回上一頁